Menu
  • Home
      • About Geostroy

        About Us

        Certificates and licences

        Membership

        Team and resources

        Awards

        Company policy

        Careers

        Read more
      • Business units
        INFRASTRUCTURE PROJECTS

        INDUSTRIAL PROJECTS

        CIVIL PROJECTS

        MINING OPERATIONS

        LAND SURVEYING SERVICES
        Read more
      • Contacts

        Telephone:+359 2 902 40 90
        Fax:+359 2 958 20 14
        Email: office@geostroy.com

  • About GEOSTROY AD
      • About us
      • Certificates and licences
      • Membership
      • Awards
      • Team and resources
      • Company policy
      • Careers
      • Certificates and licences
      • Awards
  • Business units
      • MINING OPERATIONS
      • LAND SURVEYING SERVICES
  • Projects
      • CURRENT PROJECTS
      • Completed Projects
          • DESIGN AND CONSTRUCTION OF INFRASTRUCTURE PROJECTS
          • DESIGN AND CONSTRUCTION OF INDUSTRIAL PROJECTS
          • DESIGN AND CONSTRUCTION OF CIVIL PROJECTS
  • News
      • News
      • Archive News
  • CSR
  • Contacts

Rehabilitation of Koznitsa Railway Tunnel

 
  • Employer: National Railway Infrastructure Company
  • Contractor: Infrastructurno Stroitelstvo – Geostroy Consortium
  • Project implementation period: 2019 - 2020 

In February 2020, Infrastructurno Stroitelstvo – Geostroy Consortium commenced construction works under the project Rehabilitation of the Railway Track, the Artificial Facilities, the Facilities and Devices of the Power Supply System from the Railway Infrastructure in Koprivshtitsa – Stryama Interstation Section from km 100+525 to km 106+337. The total length of the section is 5.8 km.

Koprivshtitsa – Stryama interstation section was built as a one-way railway line on the 3rd Railway Line Iliyantsi-Stolnik-Karlovo-Tulovo-Dabovo-Zimnitsa. Almost the entire section runs through Koznitsa Tunnel which is now the longest railway tunnel in Bulgaria.

The contract scope includes design and complete renewal of the railway track in the section. The project works also include strengthening of the railway subgrade, construction of drainage facilities, repair of the tunnel structure and catenary, installation of a tunnel lighting system, as well as a video surveillance system at the two tunnel entrances. Furthermore, works related to the installation of safety equipment and telecommunication facilities were carried out.

The construction works are to be completed during the second half of 2020.

  • Bulgarian (BG)
  • English (UK)
Privacy policy            COOKIES Copyright © 2021 Geostroy. Created by ITR SERVICES
 
geostroy

Login form

Login with Facebook
Login with Google
  • Forgot your username?
  • Forgot your password?
  • Create an account

Този сайт използва бисквитки, ако продължите да използвате сайта ни вие се съгласявате с нашата политика за бисквитките.

Научи повече