logo of Geostroy AD
Menu
  • Home
      • About Geostroy

        About Us

        Certificates and licences

        Membership

        Team and resources

        Awards

        Company policy

        Careers

        Read more
      • Business units
        INFRASTRUCTURE PROJECTS

        INDUSTRIAL PROJECTS

        CIVIL PROJECTS

        MINING OPERATIONS

        LAND SURVEYING SERVICES
        Read more
      • Contacts

        Telephone:+359 2 902 40 90
        Fax:+359 2 958 20 14
        Email: office@geostroy.com

  • About GEOSTROY AD
      • About us
      • Certificates and licences
      • Membership
      • Awards
      • Team and resources
      • Company policy
      • Careers
      • Certificates and licences
      • Awards
  • Business units
      • MINING OPERATIONS
      • LAND SURVEYING SERVICES
  • Projects
      • CURRENT PROJECTS
      • Completed Projects
          • DESIGN AND CONSTRUCTION OF INFRASTRUCTURE PROJECTS
          • DESIGN AND CONSTRUCTION OF INDUSTRIAL PROJECTS
          • DESIGN AND CONSTRUCTION OF CIVIL PROJECTS
  • News
      • News
      • Archive News
  • CSR
  • Contacts

Commercial Storehouse with Office Premises in Lyulin District, Sofia

  • Employer: Hydromat Ltd
  • Contractor: Geostroy AD
  • Project completed in 2019

The project is built on a site area of 6,857 m2 located in Lyulin Residential District south of Sofia Ring Road. The main access to the site is by a southwest access road, via two separate entrances for vehicles and pedestrians.

There is a car park for 10 cars in front of the building and 18 parking spaces are provided under the shed. The total floorage area of the building is 4,097 m2 comprising two separate sections: an administrative office building and a storehouse.

The administrative office building consists of three floors without a basement level. It is constructed by applying the traditional cast-in-situ method using reinforced concrete structural elements.

The storehouse is located behind the administrative section, with a covered loading and unloading area in front of the entrances. The building is erected using prefabricated steel structures on one floor and a partial cast-in-situ basement.

  • Bulgarian (BG)
  • English (UK)
Privacy policy            COOKIES Copyright © Geostroy. Created by ITR SERVICES
 
geostroy

Login form

Login with Facebook
Login with Google
  • Forgot your username?
  • Forgot your password?

This website uses cookies, if you continue to use our website you confirm that you consent with our cookies policy.

Learn more