RAW VERMICULITE SEPARATING INSTALLATION
GEOSTROY built an installation which produces vermiculite concentrate and exfoliated vermiculite by processing and enrichment of raw vermiculite in the village of Gara Elin Pelin.
The project includes two storage houses – for raw vermiculite and for finished product, and a production building for separation and exfoliation of vermiculite.
The supplementary facilities include a service building, a weighbridge and a transformer substation. The work scope also includes landscaping, external power and water supply infrastructure, site fencing and grassing.