Alexander Malinov Boulevard, Mladost Residential District, between Metro Station 15 and Metro Station 16
GEOSTROY, as a leader in Geometro B.P. Consortium, executed the reconstruction of Alexander Malinov Blvd on the metro tunnel alignment between Metro Station 15 and Metro Station 16, as well as an entirely new road section between Metro Station 15 and km 17+500 to redirect traffic towards the metro route.
The work scope included the construction of a new roadway and correction of existing ones, execution of curbs, road pavements and landscaping (planting trees, shrubs and grass in adjoining green areas). Initially, Sofia Metro Extension Project had envisaged that the section would be entirely grassed. Subsequently, a change in the design solution was made, which became a new challenge for GEOSTROY’s team and its partners in the consortium as it required full coordination between the road works and the construction works in the metro station.