Menu
  • Home
      • About Geostroy

        About Us

        Certificates and licences

        Membership

        Team and resources

        Awards

        Company policy

        Careers

        Read more
      • Business units
        INFRASTRUCTURE PROJECTS

        INDUSTRIAL PROJECTS

        CIVIL PROJECTS

        MINING OPERATIONS

        LAND SURVEYING SERVICES
        Read more
      • Contacts

        Telephone:+359 2 902 40 90
        Fax:+359 2 958 20 14
        Email: office@geostroy.com

  • About GEOSTROY AD
      • About us
      • Certificates and licences
      • Membership
      • Awards
      • Team and resources
      • Company policy
      • Careers
      • Certificates and licences
      • Awards
  • Business units
      • MINING OPERATIONS
      • LAND SURVEYING SERVICES
  • Projects
      • CURRENT PROJECTS
      • Completed Projects
          • DESIGN AND CONSTRUCTION OF INFRASTRUCTURE PROJECTS
          • DESIGN AND CONSTRUCTION OF INDUSTRIAL PROJECTS
          • DESIGN AND CONSTRUCTION OF CIVIL PROJECTS
  • News
      • News
      • Archive News
  • CSR
  • Contacts

Lot 1 of Road I-1 Mezdra – Botevgrad

 
  • Employer:Road Infrastructure Agency
  • Contractor: GEOPAT LOT 1 Consortium
  • Project under construction

Geopat lot 1 Consortium comprising Geostroy as leader has been executing the design-build project Lot 1 of Road I-1 (E-79) Mezdra-Botevgrad. The total length of the road section is 19.3 km.

The project envisages reconstruction and modernization of the exiting road section I-1 (E-97) Mezdra-Botevgrad from km 174+800 to km 194+122. The new road will be widened to a four-lane expressway with two lanes in each direction. Furthermore, new bypass road to the villages of Lyuti Dol, Novachеne and Skravena will be built.

The project also includes the construction of two-level road junctions at Botevgrad, Lyuti Dol and Novachene. Numerous roadside facilities will be built, such as large bridge structures, roadside facilities, support installations for intelligent transport systems, and public recreation areas.

A fully-completed 7=5 km section of the expressway has been put into operation between the villages of Skravena and Novachene. It includes Novachene road junction, tree bridges, two overpasses, engineering infrastructure and utility connections, public recreation areas. New street lighting, road markings, road restraint systems, noise screens and bat shielding devices were installed. Reinforced each retaining walls werw also constructed.

  • Bulgarian (BG)
  • English (UK)
Privacy policy            COOKIES Copyright © Geostroy. Created by ITR SERVICES
 
geostroy

Login form

Login with Facebook
Login with Google
  • Forgot your username?
  • Forgot your password?

This website uses cookies, if you continue to use our website you confirm that you consent with our cookies policy.

Learn more