logo of Geostroy AD
Menu
  • Home
      • About Geostroy

        About Us

        Certificates and licences

        Membership

        Team and resources

        Awards

        Company policy

        Careers

        Read more
      • Business units
        INFRASTRUCTURE PROJECTS

        INDUSTRIAL PROJECTS

        CIVIL PROJECTS

        MINING OPERATIONS

        LAND SURVEYING SERVICES
        Read more
      • Contacts

        Telephone:+359 2 902 40 90
        Fax:+359 2 958 20 14
        Email: office@geostroy.com

  • About GEOSTROY AD
      • About us
      • Certificates and licences
      • Membership
      • Awards
      • Team and resources
      • Company policy
      • Careers
      • Certificates and licences
      • Awards
  • Business units
      • MINING OPERATIONS
      • LAND SURVEYING SERVICES
  • Projects
      • CURRENT PROJECTS
      • Completed Projects
          • DESIGN AND CONSTRUCTION OF INFRASTRUCTURE PROJECTS
          • DESIGN AND CONSTRUCTION OF INDUSTRIAL PROJECTS
          • DESIGN AND CONSTRUCTION OF CIVIL PROJECTS
  • News
      • News
      • Archive News
  • CSR
  • Contacts

Geostroy AD took part in the 7th Annual Conference "Strategic Infrastructure Bulgaria 2012"

At the 7th Annual Conference “Strategic Infrastructure Bulgaria 2012” Geostroy AD presented innovative solutions and technological challenges used in the construction of Metrostation 11 “James Bourchier”, part of the second metrodiameter. The conference was held on March 29, 2012 in Sofia.

The company participated in the panel for Sofia Metro Extension Project as a subcontractor of most construction works, Part Structural, for Metro Station 11-II and the adjoining tunnel and underground car-park.

For the first time in Sofia Metro construction, the technology for post-tensioning of reinforced concrete structures has been used in the execution of Metrostation 11-II. The method was applied both to the construction of the roof slab of the tunnel section, and to the floor slabs in the tunnel and the metrostation. The works have been performed under heavy traffic conditions.

  • Bulgarian (BG)
  • English (UK)
Privacy policy            COOKIES Copyright © Geostroy. Created by ITR SERVICES
 
geostroy

Login form

Login with Facebook
Login with Google
  • Forgot your username?
  • Forgot your password?

This website uses cookies, if you continue to use our website you confirm that you consent with our cookies policy.

Learn more