logo of Geostroy AD
Menu
  • Home
      • About Geostroy

        About Us

        Certificates and licences

        Membership

        Team and resources

        Awards

        Company policy

        Careers

        Read more
      • Business units
        INFRASTRUCTURE PROJECTS

        INDUSTRIAL PROJECTS

        CIVIL PROJECTS

        MINING OPERATIONS

        LAND SURVEYING SERVICES
        Read more
      • Contacts

        Telephone:+359 2 902 40 90
        Fax:+359 2 958 20 14
        Email: office@geostroy.com

  • About GEOSTROY AD
      • About us
      • Certificates and licences
      • Membership
      • Awards
      • Team and resources
      • Company policy
      • Careers
      • Certificates and licences
      • Awards
  • Business units
      • MINING OPERATIONS
      • LAND SURVEYING SERVICES
  • Projects
      • CURRENT PROJECTS
      • Completed Projects
          • DESIGN AND CONSTRUCTION OF INFRASTRUCTURE PROJECTS
          • DESIGN AND CONSTRUCTION OF INDUSTRIAL PROJECTS
          • DESIGN AND CONSTRUCTION OF CIVIL PROJECTS
  • News
      • News
      • Archive News
  • CSR
  • Contacts

Restoration and structural strengthening of St Mina Church

  • The restored church of St. Mina
  • The restored church of St. Mina
  • The interior of the restored church of St. Mina
  • The interior of the restored church of St. Mina
  • Employer: Church Board of Trustees at St Mina Church
  • Contractor:  Geostroy AD
  • Project completed in 2025

Geostroy has completed the structural strengthening and restoration of the historic St Mina Church, located in Slatina Residential District in Sofia. The church dates back to the 19th century and is recognised as an architectural and artistic monument of culture.

Extensive construction work and design modifications were performed as part of a general overhaul, aimed at improving the property while preserving the church’s authentic appearance. The structure was reinforced with new concrete belts, and the roof was entirely rebuilt and covered with old-style Bulgarian pan tiles.

A new bell tower, a service building, a safety fence, and a security system with video surveillance were constructed in the churchyard. Additionally, new water and power supply lines, along with a platform for people with disabilities, were installed to ensure accessibility. Outdoor lighting has also been added and the churchyard has been fully landscaped and beautified.

The construction and repair works were executed under the Bulgarian Virtues Charity Programme of GEOTECHMIN GROUP.

  • Bulgarian (BG)
  • English (UK)
Privacy policy            COOKIES Copyright © Geostroy. Created by ITR SERVICES
 
geostroy

Login form

Login with Facebook
Login with Google
  • Forgot your username?
  • Forgot your password?