STRUMA MOTORWAY, LOT 3.3 KRESNA - SANDANSKI ROAD SECTION
GEOSTROY is a partner in Struma – Lot 3.3 Consortium – the contractor responsible for the construction of Kresna - Sandanski road section of Struma Motorway.
The total lenght of Lot 3.3 is about 23.6 km. The main part of the new motorway passes alongside the River Struma and the existing Е-79 road which will be fully preserved
The project envisages the construction of 9 large bridges in total length of 980 m, 2 road junctions near the village of Strumyani and near the town of Sandanski and a great number of site-specific road construction facilities and adjoining infrastructure.
The project is financed under Operational Programme Transport and Transport infrastructure 2014 – 2020 and is implemented in accordance with the contractual terms of FIDIC, Yellow Book.